search-plus sort-alpha-asc sort-alpha-desc spinner th th-large th-list window-close linkedin twitter facebook youtube instagram google email phone description download globe help info person plus-circle search arrow_left arrow_right arrow_down maximise

Chesterfield FC Proact Stadium

Home » Case Studies » Chesterfield FC Proact Stadium

ASD Lighting supplied the lighting for the new Chesterfield Football Club ground which was completed before the start of the 2010/2011 season.


One of the requirements for this installation was modular wiring on all the recessed luminaires used throughout the stadium, many luminaires were in corporate areas where lighting controls and dimming systems were to be used meaning a 6 pole modular wiring system was required. For this project we worked in partnership with Wago to come up with a tailor made solution.

Flying leads with a T-Piece connector were supplied on the ASD Lighting luminaires meaning all the installer needed to do onsite was put the luminaires in to position and then connect up all the luminaires using the specified Male-Female connector leads. Simple!